RN149 Etudes aménagements routiers entre Poitiers et Bressuire
AI summary
This tender concerns engineering and feasibility studies for road improvements on RN149 between Poitiers and Bressuire. The scope includes opportunity assessment phase 2, preliminary studies, and preparation of a public-utility declaration required for the project.
Engineering consultancies and design firms specializing in road infrastructure, urban planning, and public infrastructure projects should apply.
Suppliers must be qualified engineering firms capable of conducting feasibility studies, environmental assessments, and public-utility documentation. Experience with French road infrastructure projects and regulatory processes is essential.
Frequently asked questions
What is this tender about?
This tender concerns engineering and feasibility studies for road improvements on RN149 between Poitiers and Bressuire. The scope includes opportunity assessment phase 2, preliminary studies, and preparation of a public-utility declaration required for the project.
What are the requirements for suppliers?
Suppliers must be qualified engineering firms capable of conducting feasibility studies, environmental assessments, and public-utility documentation. Experience with French road infrastructure projects and regulatory processes is essential.
What type of company should bid?
Engineering consultancies and design firms specializing in road infrastructure, urban planning, and public infrastructure projects should apply.
Who is the buyer?
The buyer is DREAL Nouvelle Aquitaine.
When does this tender close?
Submissions close on May 7, 2026.
RN149 Etudes aménagements routiers entre Poitiers et Bressuire Études d’opportunité phase 2, Études préalables et Déclaration d’Utilité Publique
Département des Deux-Sèvres (79) RN149 – Aménagement de créneaux de dépassement « Chiché Saint Sauveur » RN149 – Aménagement de créneaux de dépassement « Nord Parthenay »
Département de la Vienne (86) RN149 – Aménagement de créneaux de dépassement « Vouillé » RN149RN147RD347 – Réaménagement de l’échangeur
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…