TRAVAUX DE SÉCURISATION ET DE REFONTE DU POSTE DE RELÈVEMENT EAUX USÉES DU PUSSOUÉ À ERQUY
AI summary
This tender concerns safety reinforcement and complete renovation of the wastewater pumping station at Pussoué in Erquy. The works will modernise and secure the existing lifting station infrastructure to ensure reliable operation of the sewage system.
Established construction or civil engineering companies with proven experience in public sewage and water infrastructure projects should bid. Registration on relevant professional registers (RGE or equivalent) is likely required.
Suppliers must be qualified construction contractors experienced in wastewater treatment infrastructure, civil engineering works, and pump station installation. Technical competence in hydraulic systems and compliance with French environmental standards is essential.
Frequently asked questions
What is this tender about?
This tender concerns safety reinforcement and complete renovation of the wastewater pumping station at Pussoué in Erquy. The works will modernise and secure the existing lifting station infrastructure to ensure reliable operation of the sewage system.
What are the requirements for suppliers?
Suppliers must be qualified construction contractors experienced in wastewater treatment infrastructure, civil engineering works, and pump station installation. Technical competence in hydraulic systems and compliance with French environmental standards is essential.
What type of company should bid?
Established construction or civil engineering companies with proven experience in public sewage and water infrastructure projects should bid. Registration on relevant professional registers (RGE or equivalent) is likely required.
Who is the buyer?
The buyer is Lamballe Terre et Mer Agglomération.
When does this tender close?
Submissions close on May 18, 2026.
Description not provided
Documents not listed
Products & services not specified
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…