REMPLACEMENT DE LA PARTIE CMSI DU SYSTEME DE SECURITE INCENDIE DU CENTRE HOSPITALIER INTERCOMMUNAL DE VILLENEUVE-SAINT-GEORGES
AI summary
This tender concerns the replacement of the CMSI (fire safety control and signalling component) of the fire security system at the Intercommunal Hospital Centre of Villeneuve-Saint-Georges. The project involves upgrading the central fire detection and alarm management equipment to ensure compliance with current safety standards.
The bidder should be a specialized fire safety systems integrator or equipment manufacturer with proven expertise in healthcare facility installations and regulatory compliance.
Suppliers must be qualified in fire safety systems installation and maintenance. They should demonstrate experience with hospital fire detection systems and provide technical documentation, installation plans, and after-sales support commitments.
Frequently asked questions
What is this tender about?
This tender concerns the replacement of the CMSI (fire safety control and signalling component) of the fire security system at the Intercommunal Hospital Centre of Villeneuve-Saint-Georges. The project involves upgrading the central fire detection and alarm management equipment to ensure compliance with current safety standards.
What are the requirements for suppliers?
Suppliers must be qualified in fire safety systems installation and maintenance. They should demonstrate experience with hospital fire detection systems and provide technical documentation, installation plans, and after-sales support commitments.
What type of company should bid?
The bidder should be a specialized fire safety systems integrator or equipment manufacturer with proven expertise in healthcare facility installations and regulatory compliance.
Who is the buyer?
The buyer is CHI CRETEIL.
When does this tender close?
Submissions close on May 13, 2026.
Description not provided
Documents not listed
Products & services not specified
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…