Travaux d’aménagement du casier bioréacteur CB13 et de réhabilitation du casier bioréacteur CB11 sur l’Installation de Stockage de Déchets Non Dangereux (ISDND) de Sainte-Flaive-des-Loups

AI summary

This tender concerns development works on bioreactor cell CB13 and rehabilitation of bioreactor cell CB11 at the non-hazardous waste storage facility (ISDND) operated by Trivalis in Sainte-Flaive-des-Loups. The project involves construction and engineering works to upgrade and rehabilitate these waste containment structures.

#waste management#landfill infrastructure#bioreactor cell#construction works#sainte-flaive-des-loups#environmental remediation#france
Fit for

Construction companies or engineering firms specializing in waste management infrastructure, landfill operations, or environmental remediation should bid.

Key requirements

Suppliers must be qualified in waste facility construction and bioreactor cell rehabilitation. Experience with landfill infrastructure projects and compliance with French environmental regulations is required.

Frequently asked questions

  • What is this tender about?

    This tender concerns development works on bioreactor cell CB13 and rehabilitation of bioreactor cell CB11 at the non-hazardous waste storage facility (ISDND) operated by Trivalis in Sainte-Flaive-des-Loups. The project involves construction and engineering works to upgrade and rehabilitate these waste containment structures.

  • What are the requirements for suppliers?

    Suppliers must be qualified in waste facility construction and bioreactor cell rehabilitation. Experience with landfill infrastructure projects and compliance with French environmental regulations is required.

  • What type of company should bid?

    Construction companies or engineering firms specializing in waste management infrastructure, landfill operations, or environmental remediation should bid.

  • Who is the buyer?

    The buyer is Trivalis (85).

Description not provided

Computing match…

AI document analysis

We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.

Loading…