FOURNITURE ET INSTALLATION DE PONTS ELEVATEURS POUR LE POLE GARAGE DU CONSEIL DEPARTEMENTAL D'INDRE ET LOIRE
AI summary
This tender concerns the supply and installation of vehicle lifting bridges for light and heavy vehicles at the garage facility of the Indre-et-Loire Departmental Council. The contract is valued at approximately €215,000.
Established equipment suppliers or integrators with proven experience in automotive garage infrastructure and lifting bridge systems should bid.
Suppliers must be qualified to supply and install automotive lifting equipment. Technical compliance with safety standards and installation capacity are required.
Frequently asked questions
What is this tender about?
This tender concerns the supply and installation of vehicle lifting bridges for light and heavy vehicles at the garage facility of the Indre-et-Loire Departmental Council. The contract is valued at approximately €215,000.
What are the requirements for suppliers?
Suppliers must be qualified to supply and install automotive lifting equipment. Technical compliance with safety standards and installation capacity are required.
What type of company should bid?
Established equipment suppliers or integrators with proven experience in automotive garage infrastructure and lifting bridge systems should bid.
Who is the buyer?
The buyer is Conseil départemental d'Indre et Loire.
When does this tender close?
Submissions close on April 24, 2026.
What is the estimated value?
The estimated value is 215,000 EUR.
FOURNITURE DE PONTS ELEVATEURS POUR VEHICULES LEGERS ET POIDS LOURDS
Fourniture et installation de ponts élévateurs pour véhicules légers
Montant minimum 12 000 euro(s) HT et maximum 70 000 euro(s) HT pour la durée totale du marché
Fourniture et installation de ponts élévateurs pour véhicules poids lourds
Montant minimum 40 000 euro(s) HT et maximum 145 000 euro(s) HT pour la durée totale du marché
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…