RN 88 – Contournement de Baraqueville – Pose d’un écran acoustique sur l’ouvrage OA 11 au niveau des Terrisses
AI summary
This tender concerns the installation of an acoustic screen on bridge structure OA 11 along the RN 88 bypass route near Baraqueville. The project aims to reduce noise pollution for residents in the Terrisses area through a specialized sound-dampening installation on existing infrastructure.
Specialized contractors experienced in acoustic engineering and civil infrastructure projects should bid. Companies must demonstrate technical capability and relevant experience with similar noise mitigation installations.
Suppliers must have proven expertise in acoustic screen installation and highway infrastructure work. Technical qualifications, relevant project experience, and compliance with French construction standards are required.
Frequently asked questions
What is this tender about?
This tender concerns the installation of an acoustic screen on bridge structure OA 11 along the RN 88 bypass route near Baraqueville. The project aims to reduce noise pollution for residents in the Terrisses area through a specialized sound-dampening installation on existing infrastructure.
What are the requirements for suppliers?
Suppliers must have proven expertise in acoustic screen installation and highway infrastructure work. Technical qualifications, relevant project experience, and compliance with French construction standards are required.
What type of company should bid?
Specialized contractors experienced in acoustic engineering and civil infrastructure projects should bid. Companies must demonstrate technical capability and relevant experience with similar noise mitigation installations.
Who is the buyer?
The buyer is Ministère Transition Ecologique.
When does this tender close?
Submissions close on May 7, 2026.
Description not provided
Documents not listed
Products & services not specified
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…