Construction de la nouvelle usine de production du Maltrait
AI summary
This tender concerns the construction of a new drinking water production facility for Maltrait, including a storage reservoir and hydraulic connections to existing distribution networks. The project encompasses civil works, technical installations, and infrastructure integration.
General contractors or specialized water infrastructure companies with proven experience in potable water production facilities and distribution network connections should bid.
Suppliers must be qualified construction companies with experience in water infrastructure projects. Demonstrated capability in hydraulic systems, reservoir construction, and network integration is required.
Frequently asked questions
What is this tender about?
This tender concerns the construction of a new drinking water production facility for Maltrait, including a storage reservoir and hydraulic connections to existing distribution networks. The project encompasses civil works, technical installations, and infrastructure integration.
What are the requirements for suppliers?
Suppliers must be qualified construction companies with experience in water infrastructure projects. Demonstrated capability in hydraulic systems, reservoir construction, and network integration is required.
What type of company should bid?
General contractors or specialized water infrastructure companies with proven experience in potable water production facilities and distribution network connections should bid.
Who is the buyer?
The buyer is SIBAM.
Construction d'une unité de production d'eau potable, d'un réservoir de stockage et des raccordements hydrauliques aux réseaux de distribution existants
Construction de la nouvelle usine de production du Maltrait
Construction d'une unité de production d'eau potable, d'un réservoir de stockage et des raccordements hydrauliques aux réseaux de distribution existants
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…