Lot2 acquis. livraison, install., mise en service d'1 Equip. de simulation temps-réel + logiciel + équip. de pilotage temps-réel d'1 banc de roulage lot1,d'1 alimentation électr. continue rév.

AI summary

This tender concerns the acquisition, delivery, installation, and commissioning of a real-time simulation equipment package for a rolling bench test facility. The scope includes simulation software, real-time control equipment for Lot 1 rolling bench, and a DC power supply unit.

#simulation equipment#rolling bench#real-time control#automotive testing#installation commissioning#france
Fit for

Companies specializing in automotive testing equipment, simulation systems, or industrial control solutions with installation and commissioning capabilities should apply.

Key requirements

Suppliers must be capable of delivering and installing specialized simulation and testing equipment, with proven experience in real-time systems integration and technical commissioning services for automotive or similar testing facilities.

Frequently asked questions

  • What is this tender about?

    This tender concerns the acquisition, delivery, installation, and commissioning of a real-time simulation equipment package for a rolling bench test facility. The scope includes simulation software, real-time control equipment for Lot 1 rolling bench, and a DC power supply unit.

  • What are the requirements for suppliers?

    Suppliers must be capable of delivering and installing specialized simulation and testing equipment, with proven experience in real-time systems integration and technical commissioning services for automotive or similar testing facilities.

  • What type of company should bid?

    Companies specializing in automotive testing equipment, simulation systems, or industrial control solutions with installation and commissioning capabilities should apply.

  • Who is the buyer?

    The buyer is LYCEE POLYVALENT JOSEPH GALLIENI.

Description not provided

Computing match…

AI document analysis

We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.

Loading…