Modernisation du système de sonorisation de l'Aérogare

DeadlineMay 12, 2026 at 01:00 PMClosed 64 days ago

AI summary

This tender concerns the modernisation of the public address and sound system at Basel Mulhouse Airport's terminal building. The project involves upgrading existing audio infrastructure to meet current operational and passenger communication requirements.

#audio systems#airport infrastructure#bâle mulhouse#system modernisation#sound engineering#terminal facilities
Fit for

System integrators and audio equipment specialists with experience in large-scale airport or transport terminal projects should apply. References from similar critical infrastructure installations are required.

Key requirements

Suppliers must have proven expertise in airport terminal sound system design and installation. Technical capability to integrate with existing infrastructure and compliance with aviation industry standards are essential.

Frequently asked questions

  • What is this tender about?

    This tender concerns the modernisation of the public address and sound system at Basel Mulhouse Airport's terminal building. The project involves upgrading existing audio infrastructure to meet current operational and passenger communication requirements.

  • What are the requirements for suppliers?

    Suppliers must have proven expertise in airport terminal sound system design and installation. Technical capability to integrate with existing infrastructure and compliance with aviation industry standards are essential.

  • What type of company should bid?

    System integrators and audio equipment specialists with experience in large-scale airport or transport terminal projects should apply. References from similar critical infrastructure installations are required.

  • Who is the buyer?

    The buyer is Aéroport de Bâle Mulhouse (68).

  • When does this tender close?

    Submissions close on May 12, 2026.

Description not provided

Computing match…

AI document analysis

We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.

Loading…