Création d'un poste de distribution haute tension et raccordements VRD au Port de Suffren (Paris 7)

AI summary

This tender concerns the construction and commissioning of a high-voltage distribution substation and associated utility infrastructure (VRD) at Port de Suffren in Paris's 7th arrondissement. The project includes electrical installations and connection works to support port operations.

#high voltage distribution#electrical infrastructure#port construction#paris#utility works#industrial electrical
Fit for

Contractors specializing in high-voltage electrical infrastructure, utility installations, and industrial-scale distribution systems should bid. Experience in port or maritime projects is advantageous.

Key requirements

Suppliers must hold relevant qualifications for high-voltage electrical works and utility infrastructure installation. Experience with port or industrial projects and compliance with French electrical standards are expected.

Frequently asked questions

  • What is this tender about?

    This tender concerns the construction and commissioning of a high-voltage distribution substation and associated utility infrastructure (VRD) at Port de Suffren in Paris's 7th arrondissement. The project includes electrical installations and connection works to support port operations.

  • What are the requirements for suppliers?

    Suppliers must hold relevant qualifications for high-voltage electrical works and utility infrastructure installation. Experience with port or industrial projects and compliance with French electrical standards are expected.

  • What type of company should bid?

    Contractors specializing in high-voltage electrical infrastructure, utility installations, and industrial-scale distribution systems should bid. Experience in port or maritime projects is advantageous.

  • Who is the buyer?

    The buyer is Grand port fluvio maritime de l'axe Seine - Direction territoriale de Paris.

Description not provided

Computing match…

AI document analysis

We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.

Loading…