Travaux d'installation d'ombrières photovoltaïques et prestation de maintenance sur 2 parkings attenants à la patinoire Pôle Sud
AI summary
This tender concerns the installation of photovoltaic canopy structures and maintenance services on two parking areas adjoining the Pôle Sud ice rink in Grenoble. The project includes both the design and construction of solar shade structures and ongoing maintenance obligations over a specified contract period.
Contractors specializing in renewable energy infrastructure, particularly photovoltaic installations, should bid. Companies with experience in parking lot construction and solar system maintenance are preferred.
Suppliers must be qualified in photovoltaic installation and parking infrastructure projects. Experience with maintenance service contracts and demonstrated technical expertise in solar canopy systems are required.
Frequently asked questions
What is this tender about?
This tender concerns the installation of photovoltaic canopy structures and maintenance services on two parking areas adjoining the Pôle Sud ice rink in Grenoble. The project includes both the design and construction of solar shade structures and ongoing maintenance obligations over a specified contract period.
What are the requirements for suppliers?
Suppliers must be qualified in photovoltaic installation and parking infrastructure projects. Experience with maintenance service contracts and demonstrated technical expertise in solar canopy systems are required.
What type of company should bid?
Contractors specializing in renewable energy infrastructure, particularly photovoltaic installations, should bid. Companies with experience in parking lot construction and solar system maintenance are preferred.
Who is the buyer?
The buyer is Grenoble Alpes Metropole.
When does this tender close?
Submissions close on May 21, 2026.
Description not provided
Documents not listed
Products & services not specified
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…