Remplacement des prétraitements et traitement primaires existants STEP du Corniguel Phase 1 : Candidatures

AI summary

This tender concerns the replacement of existing pretreatment and primary treatment facilities at the Corniguel wastewater treatment plant in Quimper. The project includes a preparation phase with site setup and design studies, followed by construction, commissioning, staff training, and handover. An optional phase covers additional siphon pipeline work from Meilh Kerdour.

#wastewater treatment#quimper#france#water infrastructure#construction#pretreatment#civil works
Fit for

Established construction or civil engineering firms specializing in water and wastewater infrastructure, with proven experience in treatment plant modernization and technical capacity for multi-phase projects.

Key requirements

Bidders must be qualified construction companies capable of wastewater treatment plant works, including design, installation, and commissioning. Experience with water infrastructure projects and ability to manage site preparation and staff training are required.

Frequently asked questions

  • What is this tender about?

    This tender concerns the replacement of existing pretreatment and primary treatment facilities at the Corniguel wastewater treatment plant in Quimper. The project includes a preparation phase with site setup and design studies, followed by construction, commissioning, staff training, and handover. An optional phase covers additional siphon pipeline work from Meilh Kerdour.

  • What are the requirements for suppliers?

    Bidders must be qualified construction companies capable of wastewater treatment plant works, including design, installation, and commissioning. Experience with water infrastructure projects and ability to manage site preparation and staff training are required.

  • What type of company should bid?

    Established construction or civil engineering firms specializing in water and wastewater infrastructure, with proven experience in treatment plant modernization and technical capacity for multi-phase projects.

  • Who is the buyer?

    The buyer is Quimper Bretagne Occidentale.

La présente consultation concerne le remplacement des prétraitements et traitements primaires existants sur la station d’épuration du Corniguel à Quimper, pour le compte de Quimper Bretagne Occidentale. Le programme comprend deux phases et deux tranches réparties comme suit : Phase 1 (Période de préparation : préparation du chantier, études d’exécution de l’entreprise et VISA du maître d’œuvre) Phase 2 (Réalisation des travaux : travaux, mise en service, formation du personnel et réception.) Tranche ferme : incluant les phases 1 et 2 (Période de préparation : préparation du chantier, études d’exécution de l’entreprise et VISA du maître d’œuvre, y compris la canalisation en siphon provenant du Meilh Kerdour. Réalisation des travaux : travaux, mise en service, formation du personnel et réception) Tranche optionnelle comportant la phase 2 (Réalisation des travaux : travaux sur la canalisation en siphon provenant de Meilh Kerdour, mise en service, formation du personnel et réception)

Buyer
Quimper Bretagne Occidentale
Buyer ID: 20006812000019·MME la Présidente
44 Place ST CORENTIN, 29000, QUIMPER
Body responsible for review procedures
Tribunal administratif de Rennes
Buyer ID: 17350005900014
3 contour de la Motte CS 44416, 35044, Rennes cedex

Computing match…

AI document analysis

We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.

Loading…