Réalisation d'études de sols dans le cadre de la reconstruction des Ehpad-Usld et du Mco-Smr d'Aix-les-bains du Centre Hospitalier Métropole Savoie
AI summary
This tender concerns geotechnical soil studies for the reconstruction of nursing homes (EHPAD-USLD) and acute care/rehabilitation units (MCO-SMR) at the Centre Hospitalier Métropole Savoie in Aix-les-Bains. The studies will support design and construction planning for these healthcare facility rebuilding projects.
Geotechnical engineering consultancies or civil engineering firms with soil investigation expertise and credentials in healthcare infrastructure projects should apply.
Suppliers must be qualified geotechnical engineering firms capable of conducting soil investigations, analysis, and reporting. Experience with healthcare facility site assessments and compliance with French building standards are expected.
Frequently asked questions
What is this tender about?
This tender concerns geotechnical soil studies for the reconstruction of nursing homes (EHPAD-USLD) and acute care/rehabilitation units (MCO-SMR) at the Centre Hospitalier Métropole Savoie in Aix-les-Bains. The studies will support design and construction planning for these healthcare facility rebuilding projects.
What are the requirements for suppliers?
Suppliers must be qualified geotechnical engineering firms capable of conducting soil investigations, analysis, and reporting. Experience with healthcare facility site assessments and compliance with French building standards are expected.
What type of company should bid?
Geotechnical engineering consultancies or civil engineering firms with soil investigation expertise and credentials in healthcare infrastructure projects should apply.
Who is the buyer?
The buyer is Ght Savoie Belley - Ch Métropole Savoie.
When does this tender close?
Submissions close on May 11, 2026.
Description not provided
Documents not listed
Products & services not specified
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…