Réalisation de travaux d'assainissement Eu et de travaux de renforcement de chaussée sur l'allée du Cormier à Parigne-L'Eveque (72)
AI summary
This tender concerns sewerage system works and road surface reinforcement on Allée du Cormier in Parigné-l'Evêque. The project includes installation or upgrade of water sanitation infrastructure and structural strengthening of the existing pavement to ensure safe and sustainable road conditions.
Public works and civil engineering contractors specializing in sanitation infrastructure and road construction should bid. Companies must hold appropriate licenses and demonstrate technical capacity for this category of work.
Suppliers must be qualified construction contractors with experience in sanitation works and road reinforcement. Professional liability insurance, relevant certifications, and proof of similar completed projects are typically required.
Frequently asked questions
What is this tender about?
This tender concerns sewerage system works and road surface reinforcement on Allée du Cormier in Parigné-l'Evêque. The project includes installation or upgrade of water sanitation infrastructure and structural strengthening of the existing pavement to ensure safe and sustainable road conditions.
What are the requirements for suppliers?
Suppliers must be qualified construction contractors with experience in sanitation works and road reinforcement. Professional liability insurance, relevant certifications, and proof of similar completed projects are typically required.
What type of company should bid?
Public works and civil engineering contractors specializing in sanitation infrastructure and road construction should bid. Companies must hold appropriate licenses and demonstrate technical capacity for this category of work.
Who is the buyer?
The buyer is Commune de Parigné l'Evêque.
Description not provided
Documents not listed
Products & services not specified
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…