Travaux de Viabilisation de l'opération d'habitat anticipée à CHARVEIN - Secteur n°21 de l'OIN de Guyane
AI summary
This tender concerns preliminary infrastructure and utilities development works for an anticipated housing operation in Charvein, Sector 21 of the Special Economic Zone (OIN) in French Guiana. The project includes site preparation, road construction, and utility connections necessary to enable residential development.
Construction and civil engineering companies with expertise in site development, road works, and utility infrastructure. Experience in tropical or overseas French territories is advantageous.
Suppliers must be qualified civil engineering and construction contractors with experience in infrastructure development and utilities installation. Compliance with French and local Guianese regulations is required.
Frequently asked questions
What is this tender about?
This tender concerns preliminary infrastructure and utilities development works for an anticipated housing operation in Charvein, Sector 21 of the Special Economic Zone (OIN) in French Guiana. The project includes site preparation, road construction, and utility connections necessary to enable residential development.
What are the requirements for suppliers?
Suppliers must be qualified civil engineering and construction contractors with experience in infrastructure development and utilities installation. Compliance with French and local Guianese regulations is required.
What type of company should bid?
Construction and civil engineering companies with expertise in site development, road works, and utility infrastructure. Experience in tropical or overseas French territories is advantageous.
Who is the buyer?
The buyer is Etablissement Public Foncier et d'Aménagement de la Guyane - EPFAG.
When does this tender close?
Submissions close on May 22, 2026.
Description not provided
Documents not listed
Products & services not specified
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…