Mission de maîtrise d'oeuvre relative à l'amélioration et au renforcement du réseau incendie du tunnel de Nogent (94)
AI summary
This tender concerns engineering and project management services for the improvement and reinforcement of the fire safety network in the Nogent tunnel (94), France. The project aims to upgrade fire protection infrastructure within the tunnel to meet current safety standards and regulatory requirements.
Engineering firms, project management consultancies, or specialist fire safety engineering companies with proven experience in transportation infrastructure and tunnel projects should apply.
Suppliers must have demonstrated expertise in tunnel fire safety systems, project management capabilities for infrastructure improvement, and knowledge of French fire safety regulations. Experience with similar underground transport infrastructure projects is required.
Frequently asked questions
What is this tender about?
This tender concerns engineering and project management services for the improvement and reinforcement of the fire safety network in the Nogent tunnel (94), France. The project aims to upgrade fire protection infrastructure within the tunnel to meet current safety standards and regulatory requirements.
What are the requirements for suppliers?
Suppliers must have demonstrated expertise in tunnel fire safety systems, project management capabilities for infrastructure improvement, and knowledge of French fire safety regulations. Experience with similar underground transport infrastructure projects is required.
What type of company should bid?
Engineering firms, project management consultancies, or specialist fire safety engineering companies with proven experience in transportation infrastructure and tunnel projects should apply.
Who is the buyer?
The buyer is DRIEAT IF.
Documents not listed
Mission de maîtrise d'oeuvre relative à l'amélioration et au renforcement du réseau incendie du tunnel de Nogent (94).
La mission se déroule en trois phases, telles que définies à l’article 3 du Programme de Mission (PM) : 1. Phase-1 : Appropriation et étude • Appropriation des études antérieures (Appropriation), • Réalisation des études de projet (PRO), 2. Phase-2 : Assistance à la passation des marchés de travaux (ACT), • Élaboration du Dossier de Consultation des Entreprises (DCE) • Analyse des offres sur les plans administratif, technique et financier. 3. Phase-3 :Missions DET/OPC/VISA/AOR • La Direction de l’exécution des contrats de travaux (DET) ; • L’Ordonnancement, Coordination et Pilotage du Chantier (OPC) • La procédure de contrôle de la conformité des études d’exécution (VISA) • L’Assistance aux opérations de réception (AOR).
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…