Remplacement du système de chauffage du Bât Dgac
AI summary
This tender concerns the replacement of the heating system in the DGAC building at Tours Val de Loire International Airport. The project involves removing the existing system and installing a new heating installation to modernize the facility's thermal infrastructure.
Heating installation contractors or mechanical engineering firms with proven experience in building systems replacement and airport infrastructure projects should bid.
Suppliers must be qualified heating system specialists capable of executing both removal and installation of heating equipment. Technical competence in airport facility standards and compliance with French building regulations is required.
Frequently asked questions
What is this tender about?
This tender concerns the replacement of the heating system in the DGAC building at Tours Val de Loire International Airport. The project involves removing the existing system and installing a new heating installation to modernize the facility's thermal infrastructure.
What are the requirements for suppliers?
Suppliers must be qualified heating system specialists capable of executing both removal and installation of heating equipment. Technical competence in airport facility standards and compliance with French building regulations is required.
What type of company should bid?
Heating installation contractors or mechanical engineering firms with proven experience in building systems replacement and airport infrastructure projects should bid.
Who is the buyer?
The buyer is Syndicat Mixte pour l'Aménagement et le Développement de l'Aéroport International de Tours val de Loire (Smadait).
When does this tender close?
Submissions close on June 9, 2026.
Description not provided
Documents not listed
Products & services not specified
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…