France – Travaux de construction, de fondation et de revêtement d'autoroutes, de routes – A8/A51 - Création de la liaison Lyon/Gap phase 2 – Marché TOACER
AI summary
This tender concerns the construction of a motorway interchange slip road connecting the A8 Lyon and A51 Gap highways in France. The project, titled TOACER, is phase 2 of the Lyon/Gap connection initiative. Works include foundation, construction, and surfacing of the new highway link.
Construction contractors specializing in highway infrastructure, motorway construction, and civil engineering works. Large-scale or consortium bidders with proven experience in French road projects are preferred.
Suppliers must be qualified contractors experienced in motorway construction, foundation work, and road surfacing. Bidders should demonstrate capability to manage large-scale infrastructure projects and comply with French motorway standards.
Frequently asked questions
What is this tender about?
This tender concerns the construction of a motorway interchange slip road connecting the A8 Lyon and A51 Gap highways in France. The project, titled TOACER, is phase 2 of the Lyon/Gap connection initiative. Works include foundation, construction, and surfacing of the new highway link.
What are the requirements for suppliers?
Suppliers must be qualified contractors experienced in motorway construction, foundation work, and road surfacing. Bidders should demonstrate capability to manage large-scale infrastructure projects and comply with French motorway standards.
What type of company should bid?
Construction contractors specializing in highway infrastructure, motorway construction, and civil engineering works. Large-scale or consortium bidders with proven experience in French road projects are preferred.
Who is the buyer?
The buyer is AUTOROUTES DU SUD DE LA FRANCE (ASF).
When does this tender close?
Submissions close on May 22, 2026.
Réalisation d’une bretelle autoroutière de liaison entre les autoroutes A8 Lyon et A51 Gap.
Marché TOACER (Terrassement Ouvrage d'Art Chaussée Equipement Réseaux)
Les travaux principaux sont : — Création de la bretelle depuis A8 Ouest vers A51 Nord (env. 1600ml) — Création de deux ouvrages d’art métalliques dont un non courant (40ml et 210 ml) — Création de 8 murs de soutènement (env. 3000 m²) — Balisage lourds sur A8 et A51 — Démolition de bâtiments — Réaménagement de la bretelle depuis A51 Sud vers A8 Est décalée (env. 400 ml) — Création de 3 bassins d'assainissement (1 enterré et 2 à ciel ouvert) — Création d'une 3ème voie sur A51 (env. 300 ml)
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…