France – Travaux de démolition de bâtiments et travaux de terrassement – 25TF03 - Travaux de démolition et de renforcement des dallages des 2 niveaux dans le cadre de la construction du groupe scolaire BOSSUT à Pontoise
AI summary
This tender concerns demolition and reinforcement of floor slabs on two levels for the construction of the BOSSUT school complex in Pontoise. The execution period is 8 months, including 2 months for site preparation. A design variant is required.
Contractors specialising in building demolition and structural earthworks with proven experience in school construction projects and site management capabilities.
Suppliers must conduct a mandatory site visit. They must submit a design variant proposal and demonstrate capacity to execute demolition and reinforcement works within the 8-month timeline.
Frequently asked questions
What is this tender about?
This tender concerns demolition and reinforcement of floor slabs on two levels for the construction of the BOSSUT school complex in Pontoise. The execution period is 8 months, including 2 months for site preparation. A design variant is required.
What are the requirements for suppliers?
Suppliers must conduct a mandatory site visit. They must submit a design variant proposal and demonstrate capacity to execute demolition and reinforcement works within the 8-month timeline.
What type of company should bid?
Contractors specialising in building demolition and structural earthworks with proven experience in school construction projects and site management capabilities.
Who is the buyer?
The buyer is Communauté d'Agglomération de Cergy-Pontoise.
Le délai d'exécution est de 8 mois dont 2 mois pour la période de préparation de chantier. Une variante est exigée /! VISITE SUR SITE OBLIGATOIRE
Documents not listed
25TF03 - Travaux de démolition et de renforcement des dallages des 2 niveaux dans le cadre de la construction du groupe scolaire BOSSUT à Pontoise
Le délai d'exécution est de 8 mois dont 2 mois pour la période de préparation de chantier. Une variante est exigée /! VISITE SUR SITE OBLIGATOIRE
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…