France – Travaux relatifs aux conduites d'alimentation en eau – Travaux de renouvellement du réseau d'eaux usée, d'eau potable et d'eaux pluviales Boulevard des Glycines à Briec
AI summary
This tender concerns the renewal of wastewater, drinking water, and stormwater networks along Boulevard des Glycines in Briec. The work includes replacement of water supply and drainage infrastructure to modernize the existing systems in this area.
Civil engineering contractors and water utility specialists with proven expertise in pipeline replacement and drainage system installation are sought.
Suppliers must be qualified civil engineering and water network specialists with experience in underground infrastructure renewal. They should hold relevant certifications and demonstrate capacity to manage water supply and wastewater projects.
Frequently asked questions
What is this tender about?
This tender concerns the renewal of wastewater, drinking water, and stormwater networks along Boulevard des Glycines in Briec. The work includes replacement of water supply and drainage infrastructure to modernize the existing systems in this area.
What are the requirements for suppliers?
Suppliers must be qualified civil engineering and water network specialists with experience in underground infrastructure renewal. They should hold relevant certifications and demonstrate capacity to manage water supply and wastewater projects.
What type of company should bid?
Civil engineering contractors and water utility specialists with proven expertise in pipeline replacement and drainage system installation are sought.
Who is the buyer?
The buyer is CA QUIMPER BRETAGNE OCCIDENTALE (QBO).
Travaux de renouvellement du réseau d'eaux usée, d'eau potable et d'eaux pluviales Boulevard des Glycines à Briec
Documents not listed
Travaux de renouvellement du réseau d'eaux usée, d'eau potable et d'eaux pluviales Boulevard des Glycines à Briec
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…