France – Travaux d'installation de matériel de refroidissement – Travaux de remplacement des installations de production de froid bâtiment SERAMY
AI summary
This tender concerns replacement of cooling production installations at the SERAMY building. The work involves installation of refrigeration equipment and systems. Services are priced on a fixed-price basis.
Bidders should be specialized refrigeration contractors or HVAC engineering firms with expertise in industrial cooling system installation and replacement.
Suppliers must be qualified to perform industrial refrigeration installation and replacement work. Experience with building cooling systems and fixed-price project delivery is required.
Frequently asked questions
What is this tender about?
This tender concerns replacement of cooling production installations at the SERAMY building. The work involves installation of refrigeration equipment and systems. Services are priced on a fixed-price basis.
What are the requirements for suppliers?
Suppliers must be qualified to perform industrial refrigeration installation and replacement work. Experience with building cooling systems and fixed-price project delivery is required.
What type of company should bid?
Bidders should be specialized refrigeration contractors or HVAC engineering firms with expertise in industrial cooling system installation and replacement.
Who is the buyer?
The buyer is GHSIF ETABLISSEMENT SUPPORT DU GHTSUD77.
When does this tender close?
Submissions close on May 7, 2026.
What is the estimated value?
The estimated value is 450,000 EUR.
Les prestations sont réglées par des prix forfaitaires. Travaux de remplacement des installations de production de froid bâtiment SERAMY
Travaux de remplacement des installations de production de froid bâtiment SERAMY
Les prestations sont réglées par des prix forfaitaires. Travaux de remplacement des installations de production de froid bâtiment SERAMY
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…