France – Travaux de construction d'unités industrielles – AI Travaux GC Poste Source TILLIERS (92)
AI summary
This tender concerns civil engineering works at the Tilliers substation (92) for Enedis. The project includes construction of a medium-voltage building housing 12 half-bays and new control systems, along with trenches and ducts to connect future medium-voltage networks to the facility.
Civil engineering contractors with proven experience in electrical substation construction and industrial works. Enedis-approved or equivalent qualification preferred.
Suppliers must be qualified civil engineering contractors experienced in electrical infrastructure projects. They should demonstrate capacity to execute medium-voltage substation construction and associated cable network installations.
Frequently asked questions
What is this tender about?
This tender concerns civil engineering works at the Tilliers substation (92) for Enedis. The project includes construction of a medium-voltage building housing 12 half-bays and new control systems, along with trenches and ducts to connect future medium-voltage networks to the facility.
What are the requirements for suppliers?
Suppliers must be qualified civil engineering contractors experienced in electrical infrastructure projects. They should demonstrate capacity to execute medium-voltage substation construction and associated cable network installations.
What type of company should bid?
Civil engineering contractors with proven experience in electrical substation construction and industrial works. Enedis-approved or equivalent qualification preferred.
Who is the buyer?
The buyer is Enedis SA.
When does this tender close?
Submissions close on May 8, 2026.
Travaux Génie Civil au Poste Source de TILLIERS (92) - Création d’un bâtiment HTA contenant 12 demi-rames et le nouveau contrôle commande. - Création des caniveaux et multitubulaires pour connecter les futurs réseaux HTA à ce bâtiment.
AI Travaux GC Poste Source TILLIERS (92)
Travaux Génie Civil au Poste Source de TILLIERS. - Création d’un bâtiment HTA contenant 12 demi-rames et le nouveau contrôle commande. - Création des caniveaux et multitubulaires pour connecter les futurs réseaux HTA à ce bâtiment.