This tender concerns Phase 3 railway track construction and maintenance works for SNCF Réseau. The scope includes primary track regeneration works (rail alignment, base course, sleepers), replacement of two under-track structures, and secondary works such as level crossing adaptations, vegetation clearance, drainage, ditch cleaning, and grinding operations.
This tender is suited for civil engineering and railway construction contractors with specialization in track works and infrastructure maintenance, capable of managing complex railway projects.
Suppliers must have proven expertise in railway infrastructure construction and maintenance. Experience with track regeneration, structural replacements, and associated civil works is required. Contractors should demonstrate technical capacity and compliance with SNCF and French railway standards.
Frequently asked questions
What is this tender about?
This tender concerns Phase 3 railway track construction and maintenance works for SNCF Réseau. The scope includes primary track regeneration works (rail alignment, base course, sleepers), replacement of two under-track structures, and secondary works such as level crossing adaptations, vegetation clearance, drainage, ditch cleaning, and grinding operations.
What are the requirements for suppliers?
Suppliers must have proven expertise in railway infrastructure construction and maintenance. Experience with track regeneration, structural replacements, and associated civil works is required. Contractors should demonstrate technical capacity and compliance with SNCF and French railway standards.
What type of company should bid?
This tender is suited for civil engineering and railway construction contractors with specialization in track works and infrastructure maintenance, capable of managing complex railway projects.
Who is the buyer?
The buyer is SNCF RESEAU.
Marché Phase 3 - 2026 : Travaux principaux VOIE (RAV, RB, RT et relevage) et Travaux secondaires : adaptations des PN, débroussaillage, assainissement, curage de fossés terre, meulage : Ce marché regroupe les prestations suivantes : Travaux de régénération voie - ADP + remplacement de 2 OA sous voie + base TX
Documents not listed
PUTOCHI_T01.3_VOIE_PHASE 3
Marché Phase 3 - 2026 : Travaux principaux VOIE (RAV, RB, RT et relevage) et Travaux secondaires : adaptations des PN, débroussaillage, assainissement, curage de fossés terre, meulage : Ce marché regroupe les prestations suivantes : Travaux de régénération voie - ADP + remplacement de 2 OA sous voie + base TX