France – Ouvrages pour le métro – IC-INFRAM 06 : TRAVERSES ET ROULEMENT - APPAREILS DE VOIE METRO
AI summary
This tender concerns the supply and installation of track switches and rolling surfaces for Lille's metro system. The scope includes complete renewal of switches BG7 and BA12 with traverses, renewal of switch BA3, and replacement of six rolling planes across test tracks and injection/withdrawal zones.
The bidder should be a railway infrastructure specialist or manufacturer with proven expertise in metro track systems and switching equipment.
Suppliers must be capable of manufacturing and installing railway track switches and rolling surfaces to metro specifications. Experience with metro infrastructure projects and compliance with French railway standards are required.
Frequently asked questions
What is this tender about?
This tender concerns the supply and installation of track switches and rolling surfaces for Lille's metro system. The scope includes complete renewal of switches BG7 and BA12 with traverses, renewal of switch BA3, and replacement of six rolling planes across test tracks and injection/withdrawal zones.
What are the requirements for suppliers?
Suppliers must be capable of manufacturing and installing railway track switches and rolling surfaces to metro specifications. Experience with metro infrastructure projects and compliance with French railway standards are required.
What type of company should bid?
The bidder should be a railway infrastructure specialist or manufacturer with proven expertise in metro track systems and switching equipment.
Who is the buyer?
The buyer is KEOLIS LILLE ILEVIA.
When does this tender close?
Submissions close on July 3, 2026.
Le marché a pour objet : - le renouvellement complet (y compris traverses) de l'appareil de voie BG7 ; - le renouvellement complet (y compris traverses) de l'appareils de voie BA12 ; - le renouvellement de l'appareil de voie BA3 ; - le renouvellement de 6 plans de roulement : ï§ sur la voie d'essai : ï§ des deux appareils de voie de la communication CE1, ï§ de l'appareil de voie BE1, ï§ de l'appareil de voie BE2 ; ï§ sur la zone d'injection / retrait : ï§ des deux appareils de voie de la communication C2.
IC-INFRAM 06 : TRAVERSES ET ROULEMENT - APPAREILS DE VOIE METRO
Voir ci-dessus.
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…