France – Services d'ingénierie – 2026-25CA MISSION DE MAITRISE D'OEUVRE POUR LE SYSTEME D’ASSAINISSEMENT LE MESNIL SUR OGER/BLANCS COTEAUX-OGER-.
AI summary
This tender concerns engineering services for a wastewater treatment system upgrade spanning two communes in the Champagne region. The project includes construction of a treatment unit, creation of a storage-restitution basin, installation of transport pipelines, and rehabilitation of existing lagoon basins, with a total provisional budget of €6 million.
Engineering consultancies or firms specializing in water and sanitation infrastructure design and project management should submit bids. Experience with public-sector wastewater projects and French regulatory standards is required.
Engineering firms must provide full project management (maîtrise d'œuvre) services including design, technical oversight, and compliance verification. Bidders should demonstrate expertise in wastewater infrastructure, environmental regulatory compliance (Water Framework Directive), and collective sanitation systems.
Frequently asked questions
What is this tender about?
This tender concerns engineering services for a wastewater treatment system upgrade spanning two communes in the Champagne region. The project includes construction of a treatment unit, creation of a storage-restitution basin, installation of transport pipelines, and rehabilitation of existing lagoon basins, with a total provisional budget of €6 million.
What are the requirements for suppliers?
Engineering firms must provide full project management (maîtrise d'œuvre) services including design, technical oversight, and compliance verification. Bidders should demonstrate expertise in wastewater infrastructure, environmental regulatory compliance (Water Framework Directive), and collective sanitation systems.
What type of company should bid?
Engineering consultancies or firms specializing in water and sanitation infrastructure design and project management should submit bids. Experience with public-sector wastewater projects and French regulatory standards is required.
Who is the buyer?
The buyer is Communauté d'Agglomération Epernay Coteaux et Plaine de Champagne.
When does this tender close?
Submissions close on June 29, 2026.
2026-25CA SYSTEME D’ASSAINISSEMENT LE MESNIL SUR OGER/BLANCS COTEAUX-OGER La présente mission de maîtrise d’œuvre concerne la construction d’une unité de traitement communautaire sur la commune de BLANCS COTEAUX-OGER pour les communes du MESNIL SUR OGER ET BLANCS COTEAUX-OGER dans l’environnement de la STEP actuelle de BLANCS COTEAUX-OGER, la création d’un PR avec un bassin de Stockage-Restitution (BSR) sur la commune LE MESNIL SUR OGER ainsi que la pose d’une canalisation de transport et la réhabilitation d’un bassin du lagunage BLANCS COTEAUX-OGER. Le projet s’inscrit dans un programme pluriannuel d’investissement ayant pour objectif de répondre à la mise en conformité du système d’assainissement collectif, conformément à la directive cadre sur l’eau et ses textes d’applications, au travers d’opérations portant conjointement sur le système de collecte ainsi que sur le système de traitement d’assainissement collectif. La part de l'enveloppe prévisionnelle du maitre de l'ouvrage affectée aux travaux est fixée à 6 000 000,00 € HT.
Lot unique
- PricePrix des prestations40%
- QualityQualité50%
- QualityPerformances en matière de protection de l’environnement10%
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…