France – Travaux de revêtement d'autoroutes – Programme 2027 – Rénovation des chaussées sur A57, entre Cuers et Le Luc, dans les deux sens de circulation
AI summary
This tender concerns the supply and installation of bituminous asphalt and horizontal road markings on the A57 motorway between Cuers and Le Luc in both directions. The work is part of the 2027 pavement renovation programme managed by ESCOTA.
Established asphalt and road surfacing contractors with proven expertise in motorway renovation projects and the ability to work on operational highways should bid.
Suppliers must be qualified in motorway surfacing works and capable of installing bituminous asphalt and horizontal signage on live traffic routes. Experience with dual-carriageway projects is essential.
Frequently asked questions
What is this tender about?
This tender concerns the supply and installation of bituminous asphalt and horizontal road markings on the A57 motorway between Cuers and Le Luc in both directions. The work is part of the 2027 pavement renovation programme managed by ESCOTA.
What are the requirements for suppliers?
Suppliers must be qualified in motorway surfacing works and capable of installing bituminous asphalt and horizontal signage on live traffic routes. Experience with dual-carriageway projects is essential.
What type of company should bid?
Established asphalt and road surfacing contractors with proven expertise in motorway renovation projects and the ability to work on operational highways should bid.
Who is the buyer?
The buyer is ESCOTA SOCIETE DES AUTOROUTES ESTEREL, COTE D'AZUR, PROVENCE, ALPES.
When does this tender close?
Submissions close on July 8, 2026.
Fourniture et mise en œuvre d’enrobés bitumineux et de signalisation horizontale sur autoroute en service, dans les deux sens de circulation
Programme 2027 – Rénovation des chaussées sur A57, entre Cuers et Le Luc, dans les deux sens de circulation
A titre indicatif, les travaux concernent la fourniture et la mise en œuvre d’enrobés bitumeux (Travaux de rabotage pour 597 000 m² environ, mise en œuvre d’enrobés pour 41 900 tonnes environ, ainsi que la signalisation horizontale sur un linéaire total d’environ 49 kms).
Scoring criteria not specified