This tender concerns railway infrastructure works on the RER A line (Paris suburban rail network) between Vincennes and Nogent. The project involves platform remediation and rail switch renewal across two technical scenarios totalling between 1,042 and 1,608 linear metres of main line track, scheduled for a 4-week service closure in August 2027.

#railway infrastructure#rer a#track renewal#paris#rail construction#service closure
Fit for

Bidders should be established railway construction or infrastructure renewal contractors with demonstrated experience in major transit rail projects and capability to manage complex urban rail operations.

Key requirements

Suppliers must be qualified to execute railway infrastructure works including track bed remediation and switch apparatus renewal under strict temporary service interruption protocols. Technical compliance with RATP's two mandatory scenarios and schedule adherence are essential.

Frequently asked questions

  • What is this tender about?

    This tender concerns railway infrastructure works on the RER A line (Paris suburban rail network) between Vincennes and Nogent. The project involves platform remediation and rail switch renewal across two technical scenarios totalling between 1,042 and 1,608 linear metres of main line track, scheduled for a 4-week service closure in August 2027.

  • What are the requirements for suppliers?

    Suppliers must be qualified to execute railway infrastructure works including track bed remediation and switch apparatus renewal under strict temporary service interruption protocols. Technical compliance with RATP's two mandatory scenarios and schedule adherence are essential.

  • What type of company should bid?

    Bidders should be established railway construction or infrastructure renewal contractors with demonstrated experience in major transit rail projects and capability to manage complex urban rail operations.

  • Who is the buyer?

    The buyer is RATP.

  • When does this tender close?

    Submissions close on July 1, 2026.

Dans le cadre du projet de Renouvellement des Voies Ballastées (RVB par la suite) des branches Vincennes / Marne la Vallée Chessy et Vincennes / Boissy Saint Leger) situées à l’Est de la ligne A du RER, une campagne de travaux est programmée au cours de l’été 2027. Dans ce contexte, des travaux d’assainissement de plateforme de voie (ASS par la suite), et de renouvellement d’appareil de voie (RAV par la suite) sont à réaliser sous Interruption Temporaire de Circulation (ITC par la suite) durant 4 semaines en août 2027 du vendredi 31/07/27 PDS au 23/08/27 PDS. Les travaux sont localisés entre Vincennes et Nogent entre les PK 7.216 et 8.022. La RATP définit deux scénarios techniques obligatoires : – Scénario 1 : 1042mlv de voie principale, ADV inclus Ils couvrent les PK suivants : • Voie 1 du PK 7220 au PK 7739 (519m) • Voie 2 du PK 7216 au PK 7739 (523m) – Scénario 2 : 1608mlv de voie principale, ADV inclus Ils couvrent les PK suivants : • Voie 1 du PK 7220 au PK 8022 (802m) • Voie 2 du PK 7216 au PK 8022 (806m)

Buyer
RATP
Buyer ID: 77566343801906·Mme Héléna Brunel
54 quai de la Rapée, 75599, Paris
Body responsible for review procedures
Tribunal Administratif de Paris
Buyer ID: 17750005500013
7 rue de Jouy, 75181, Paris

Computing match…

AI document analysis

We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.

Loading…