France – Élévateurs et convoyeurs – Maintenance et remplacement des transporteurs pour le refiom - Relance
AI summary
This tender concerns maintenance and replacement of conveyor belt systems for a waste-to-energy facility (REFIOM) in Chartres. The contract is fixed-price and will be executed during a scheduled technical shutdown in 2027, with a minimum 2-month notice period before work commences.
Companies specializing in industrial conveyor systems, elevators, and material handling equipment maintenance and replacement should bid.
Suppliers must be capable of executing conveyor system maintenance and replacement work within tight scheduling constraints. Technical specifications and intervention procedures are detailed in the tender specifications document (CCTP).
Frequently asked questions
What is this tender about?
This tender concerns maintenance and replacement of conveyor belt systems for a waste-to-energy facility (REFIOM) in Chartres. The contract is fixed-price and will be executed during a scheduled technical shutdown in 2027, with a minimum 2-month notice period before work commences.
What are the requirements for suppliers?
Suppliers must be capable of executing conveyor system maintenance and replacement work within tight scheduling constraints. Technical specifications and intervention procedures are detailed in the tender specifications document (CCTP).
What type of company should bid?
Companies specializing in industrial conveyor systems, elevators, and material handling equipment maintenance and replacement should bid.
Who is the buyer?
The buyer is C'CHARTRES TRAITEMENT ET VALORISATION.
When does this tender close?
Submissions close on July 15, 2026.
Il s'agit d'un marché ordinaire à prix global et forfaitaire. Le marché est conclu pour une période allant de sa date de notification à l'admission/réception de l'ensemble des prestations. La notification du marché vaut commande des fournitures. Les délais d'intervention sont précisés au CCTP. Les travaux s'effectueront lors de l'arrêt technique programmé de 2027. L'acheteur émettra un ordre de service précisant les dates précises/le planning d'intervention. Le délai de prévenance pour cet ordre de service sera de 2 mois minimum
Remplacement du transporteur refiom T6310
Maintenance majeure des transporteurs refiom T1395 et T2395
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…