France – Travaux de plomberie – Fourniture et pose de la tuyauterie et de la robinetterie de la chaufferie de Mont-de-Terre(Lille)
AI summary
This tender concerns the supply and installation of piping and fittings for the heating plant production system at Mont-de-Terre in Lille, as part of the urban heating network of the European Metropolis of Lille.
Established plumbing contractors or heating systems specialists with proven experience in district heating infrastructure projects should bid.
Suppliers must be qualified in plumbing work and have experience installing piping systems and fittings in industrial heating installations. Technical compliance with heating network standards is required.
Frequently asked questions
What is this tender about?
This tender concerns the supply and installation of piping and fittings for the heating plant production system at Mont-de-Terre in Lille, as part of the urban heating network of the European Metropolis of Lille.
What are the requirements for suppliers?
Suppliers must be qualified in plumbing work and have experience installing piping systems and fittings in industrial heating installations. Technical compliance with heating network standards is required.
What type of company should bid?
Established plumbing contractors or heating systems specialists with proven experience in district heating infrastructure projects should bid.
Who is the buyer?
The buyer is Ilenergie (59).
When does this tender close?
Submissions close on July 21, 2026.
Fourniture et pose de la tuyauterie et de la robinetterie de la production de la chaufferie de Mont-de-Terre dans le cadre du RCU de la Métropole Européenne de Lille
2026-124 - Fourniture et pose de la tuyauterie et de la robinetterie de la chaufferie de Mont-de-terre (Lille)
Fourniture et pose de la tuyauterie et de la robinetterie de la production de la chaufferie 2027 de Mont-de-Terre dans le cadre du RCU de la Métropole Européenne de Lille
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…