France – Études de faisabilité, service de conseil, analyse – MISSION DE MAITRISE D'OEUVRE RELATIVE A LA REHABILITATION DU RESERVOIR 10 000 N°2 (ET DU RESERVOIR 10 000 N°1) – STATION DE PRODUCTION D’EAU POTABLE DE LA BASTIDE - PHASE CANDIDATURE
AI summary
This tender concerns the appointment of a project manager (maître d'œuvre) to oversee studies and construction works for the rehabilitation of two 10,000 m³ drinking water storage reservoirs at La Bastide water production station. The project aims to enhance the durability and resilience of these storage facilities operated by Limoges Métropole.
Engineering firms or project management consultancies specializing in water infrastructure and public utility works should bid. Candidates must have proven experience managing complex rehabilitation projects for water supply systems.
Bidders must demonstrate expertise in water infrastructure project management, feasibility studies, and rehabilitation design. Experience managing large-scale water storage facilities and ability to coordinate engineering studies and construction oversight are essential.
Frequently asked questions
What is this tender about?
This tender concerns the appointment of a project manager (maître d'œuvre) to oversee studies and construction works for the rehabilitation of two 10,000 m³ drinking water storage reservoirs at La Bastide water production station. The project aims to enhance the durability and resilience of these storage facilities operated by Limoges Métropole.
What are the requirements for suppliers?
Bidders must demonstrate expertise in water infrastructure project management, feasibility studies, and rehabilitation design. Experience managing large-scale water storage facilities and ability to coordinate engineering studies and construction oversight are essential.
What type of company should bid?
Engineering firms or project management consultancies specializing in water infrastructure and public utility works should bid. Candidates must have proven experience managing complex rehabilitation projects for water supply systems.
Who is the buyer?
The buyer is LIMOGES METROPOLE - Communauté urbaine.
When does this tender close?
Submissions close on September 4, 2026.
Des travaux de de réhabilitation sont nécessaires sur les deux ouvrages de stockage d’eau potable de 10 000 m3 de la station de production d’eau de La Bastide. Le présent marché permettra de désigner un maitre d’œuvre qui assurera le pilotage des études et des travaux pour la réhabilitation pérenne des réservoirs afin de réduire leur vulnérabilité.
MISSION DE MAITRISE D'OEUVRE RELATIVE A LA REHABILITATION DU RESERVOIR 10 000 N°2 (ET DU RESERVOIR 10 000 N°1) – STATION DE PRODUCTION D’EAU POTABLE DE LA BASTIDE - PHASE CANDIDATURE
Des travaux de de réhabilitation sont nécessaires sur les deux ouvrages de stockage d’eau potable de 10 000 m3 de la station de production d’eau de La Bastide. Le présent marché permettra de désigner un maitre d’œuvre qui assurera le pilotage des études et des travaux pour la réhabilitation pérenne des réservoirs afin de réduire leur vulnérabilité.
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…