France – Services d'architecture, d'ingénierie et de métrage – Mission de Maîtrise d'oeuvre pour la Réhabilitation de 66 logements à L'Aigle « Les Vaux »
AI summary
This tender concerns engineering and architecture services for the project management of rehabilitating 66 residential units in L'Aigle, France, known as « Les Vaux ». The work includes technical oversight and coordination of the renovation project from design through completion.
Architecture and engineering firms or multidisciplinary consultancies with expertise in residential building rehabilitation and project management capabilities should apply.
Suppliers must be qualified architects and/or engineering firms with proven experience in residential rehabilitation projects. Professional credentials, technical capacity, and project references are required.
Frequently asked questions
What is this tender about?
This tender concerns engineering and architecture services for the project management of rehabilitating 66 residential units in L'Aigle, France, known as « Les Vaux ». The work includes technical oversight and coordination of the renovation project from design through completion.
What are the requirements for suppliers?
Suppliers must be qualified architects and/or engineering firms with proven experience in residential rehabilitation projects. Professional credentials, technical capacity, and project references are required.
What type of company should bid?
Architecture and engineering firms or multidisciplinary consultancies with expertise in residential building rehabilitation and project management capabilities should apply.
Who is the buyer?
The buyer is ORNE HABITAT.
Mission de Maîtrise d'oeuvre pour la Réhabilitation de 66 logements à L'Aigle « Les Vaux »
Documents not listed
Mission de Maîtrise d'oeuvre pour la Réhabilitation de 66 logements à L'Aigle « Les Vaux »
- QualityQualification professionnelle2%
- QualityNote méthodologique3%
- QualityRéférences4%
- PriceMontant des honoraires1%
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…