France – Études techniques – Mission d’étude relative à la révision du Plan de Prévention des Risques Naturels (PPRN) inondation et mouvements de terrain de Chamonix-Mont-Blanc
AI summary
This tender concerns a technical study for the revision of the Natural Risk Prevention Plan (PPRN) for Chamonix-Mont-Blanc, specifically addressing flood and ground movement hazards. The study will update the existing risk prevention framework to reflect current conditions and improve public safety planning.
Engineering or consulting firms specializing in natural hazards, geological surveys, and urban planning risk assessment should apply.
Suppliers must have expertise in natural hazard assessment, risk mapping, and geological/hydrological analysis. Experience with French regulatory frameworks for risk prevention plans and stakeholder consultation is required.
Frequently asked questions
What is this tender about?
This tender concerns a technical study for the revision of the Natural Risk Prevention Plan (PPRN) for Chamonix-Mont-Blanc, specifically addressing flood and ground movement hazards. The study will update the existing risk prevention framework to reflect current conditions and improve public safety planning.
What are the requirements for suppliers?
Suppliers must have expertise in natural hazard assessment, risk mapping, and geological/hydrological analysis. Experience with French regulatory frameworks for risk prevention plans and stakeholder consultation is required.
What type of company should bid?
Engineering or consulting firms specializing in natural hazards, geological surveys, and urban planning risk assessment should apply.
Who is the buyer?
The buyer is DDT74.
When does this tender close?
Submissions close on October 15, 2026.
Mission de révision du plan de prévention des risques naturels-commune de Chamonix
Mission de révision du plan de prévention des risques naturels-commune de Chamonix
- Price301%
- Qualitytechnique2%
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…