France – Travaux de construction de bâtiments multifonctionnels – Travaux de création d'une nouvelle déchetterie et d'un quai de transfert
AI summary
This tender concerns construction of multifunctional buildings including a new waste collection facility and transfer dock. The project is divided into 20 lots with a total duration of 30 months, with completion scheduled for May 2029. Mandatory site visits are required for certain lots in January and February 2026.
Construction companies capable of undertaking building works, waste management infrastructure, and transfer facilities. Experience with multifunctional projects and compliance with French public procurement regulations is required.
Suppliers must comply with formal or adapted procedures depending on the lot. Mandatory site visits are required for lots 1, 2, 3, 4, and 15. Variants are permitted for lots 2 and 15 provided the base solution is also proposed.
Frequently asked questions
What is this tender about?
This tender concerns construction of multifunctional buildings including a new waste collection facility and transfer dock. The project is divided into 20 lots with a total duration of 30 months, with completion scheduled for May 2029. Mandatory site visits are required for certain lots in January and February 2026.
What are the requirements for suppliers?
Suppliers must comply with formal or adapted procedures depending on the lot. Mandatory site visits are required for lots 1, 2, 3, 4, and 15. Variants are permitted for lots 2 and 15 provided the base solution is also proposed.
What type of company should bid?
Construction companies capable of undertaking building works, waste management infrastructure, and transfer facilities. Experience with multifunctional projects and compliance with French public procurement regulations is required.
Who is the buyer?
The buyer is Communauté de communes Val Vanoise.
20 lots. Procédure formalisée - lots 2, 3, 4, 15 et 18 Procédure adaptée - autres lots (dispositif "petit lot" de l'article R2123-1 du code de la commande publique) Visite du site obligatoire pour les lots 1, 2, 3, 4 et 15 les jeudi 15 janvier et mercredi 4 février 2026 à 14h. Facultative pour les autres lots. Variantes autorisées pour les lots 2 et 15 avec avec obligation de répondre à la solution de base. Durée globale des travaux : 30 mois. Date globale de réception des travaux : 18 mai 2029
Documents not listed
Déconstruction des installations existantes
non
Terrassements - déchetterie provisoire - protection des berges - réseaux - pont bascule
non
Soutènements
non
Gros oeuvre
non
Charpente Couverture
non
Étanchéité
non
Menuiserie extérieure
non
Portes sectionnelles
non
Serrurerie
non
Façades
non
Cloisons - Doublages - Plafonds - Peinture - Menuiserie intérieure
non
Carrelage - Faïences
non
Électricité Cfo/Cfa
non
Plomberie - Sanitaire - Chauffage - VMC
non
Voiries - Signalisation et accès
non
Station carburant
non
Clôtures - Portails - Espaces verts
non
Équipements spécialisés du quai de transfert
non
Contrôle d'accès - vidéosurveillance
non
Défense incendie de type sprinklage
non
- QualityValeur technique de l'offre50%
- PricePrix50%