France – Travaux d'installation de matériel de chauffage, de ventilation et de climatisation – Travaux de rénovation de la climatisation à Fort-De-France
AI summary
This tender concerns HVAC renovation works at Fort-de-France, including displacement and replacement of chilled water production, renovation of air conditioning in the control tower and technical rooms, replacement of fresh air handling units, and installation of a building management system (BMS).
This tender is for construction or mechanical engineering companies specializing in HVAC systems and building climate control solutions.
Suppliers must be qualified to perform industrial HVAC installation and renovation works. Experience with control tower facilities and building management systems is required.
Frequently asked questions
What is this tender about?
This tender concerns HVAC renovation works at Fort-de-France, including displacement and replacement of chilled water production, renovation of air conditioning in the control tower and technical rooms, replacement of fresh air handling units, and installation of a building management system (BMS).
What are the requirements for suppliers?
Suppliers must be qualified to perform industrial HVAC installation and renovation works. Experience with control tower facilities and building management systems is required.
What type of company should bid?
This tender is for construction or mechanical engineering companies specializing in HVAC systems and building climate control solutions.
Who is the buyer?
The buyer is DSNA-DTI.
Travaux de rénovation de la climatisation à Fort-De-France. Le projet consiste à : déplacer et remplacer la production d'eau glacée, rénover la climatisation de la tour de contrôle et des salles techniques, remplacer les centrales de traitement de l'air neuf physiologiques, installer une GTC.
Documents not listed
Travaux de rénovation de la climatisation à Fort-De-France
Travaux de rénovation de la climatisation à Fort-De-France. Le projet consiste à : déplacer et remplacer la production d'eau glacée, rénover la climatisation de la tour de contrôle et des salles techniques, remplacer les centrales de traitement de l'air neuf physiologiques, installer une GTC.
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…