France – Ponts roulants – Fourniture, installation et maintenance de poutres roulantes pour les ateliers menuiserie et serrurerie du CTM de Neuilly-sur- Seine
AI summary
This tender concerns the supply, installation, and maintenance of overhead travelling cranes (bridge cranes) for the carpentry and metalworking workshops at the CTM vocational training centre in Neuilly-sur-Seine, France.
Industrial equipment suppliers or specialized crane manufacturers with proven installation and maintenance capabilities should bid.
Suppliers must be capable of supplying, installing, and maintaining overhead cranes to professional standards. Experience with workshop equipment and compliance with relevant safety regulations is expected.
Frequently asked questions
What is this tender about?
This tender concerns the supply, installation, and maintenance of overhead travelling cranes (bridge cranes) for the carpentry and metalworking workshops at the CTM vocational training centre in Neuilly-sur-Seine, France.
What are the requirements for suppliers?
Suppliers must be capable of supplying, installing, and maintaining overhead cranes to professional standards. Experience with workshop equipment and compliance with relevant safety regulations is expected.
What type of company should bid?
Industrial equipment suppliers or specialized crane manufacturers with proven installation and maintenance capabilities should bid.
Who is the buyer?
The buyer is Ville de Neuilly-sur-Seine.
When does this tender close?
Submissions close on October 26, 2026.
Fourniture, installation et maintenance de poutres roulantes pour les ateliers menuiserie et serrurerie du CTM de Neuilly-sur-Seine
Fourniture, installation et maintenance de poutres roulantes pour les ateliers menuiserie et serrurerie du CTM de Neuilly-sur-Seine
- PriceCF. RC
- QualityCF. RC - Méthodologie
- QualityCF.RC - Délai d'intervention dépannage
- QualityCF.RC - Délai de garantie
- QualityCF.RC - Critère environnemental
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…