France – Services de conception de ponts – 0487-AC MOE plateforme multimodale
AI summary
This tender concerns engineering and project management services for the deployment of a multimodal platform at Chavelot in the Vosges department (France). The project involves bridge design and infrastructure planning for an integrated transport hub.
Engineering consultancies, architecture and design firms, and project management specialists with experience in transport infrastructure and bridge design should bid.
Suppliers must have proven expertise in bridge engineering, multimodal transport infrastructure design, and project management. Professional qualifications and relevant past experience in similar large-scale infrastructure projects are required.
Frequently asked questions
What is this tender about?
This tender concerns engineering and project management services for the deployment of a multimodal platform at Chavelot in the Vosges department (France). The project involves bridge design and infrastructure planning for an integrated transport hub.
What are the requirements for suppliers?
Suppliers must have proven expertise in bridge engineering, multimodal transport infrastructure design, and project management. Professional qualifications and relevant past experience in similar large-scale infrastructure projects are required.
What type of company should bid?
Engineering consultancies, architecture and design firms, and project management specialists with experience in transport infrastructure and bridge design should bid.
Who is the buyer?
The buyer is SEBL GRAND EST.
When does this tender close?
Submissions close on September 23, 2026.
0487-Missions de maitrise d'uvre pour le déploiement de la plateforme multimodale de Chavelot (88)
0487-AC MOE plateforme multimodale
0487-Missions de maitrise d’œuvre pour le déploiement de la plateforme multimodale de Chavelot (88)
- QualityPertinence de la note méthodologique60%
- PricePrix des prestations40%
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…