France – Services de réparation et d'entretien – AC Maintenance du tunnel de Saverne 2027 - 2034
AI summary
This tender concerns the renewal of a maintenance contract for the Saverne tunnel on the East European high-speed rail line. The contract covers preventive and corrective maintenance of all installations and systems necessary for safe tunnel operation over an 8-year period (5 firm years plus 3 optional 1-year extensions).
Specialized railway maintenance contractors with proven experience in tunnel systems and high-speed rail operations should apply. Companies must have appropriate technical capabilities and certifications for safety-critical railway work.
Suppliers must have demonstrated expertise in railway tunnel maintenance, including HVAC, lighting, safety systems, and structural inspection. Technical qualifications and experience with high-speed rail infrastructure are essential.
Frequently asked questions
What is this tender about?
This tender concerns the renewal of a maintenance contract for the Saverne tunnel on the East European high-speed rail line. The contract covers preventive and corrective maintenance of all installations and systems necessary for safe tunnel operation over an 8-year period (5 firm years plus 3 optional 1-year extensions).
What are the requirements for suppliers?
Suppliers must have demonstrated expertise in railway tunnel maintenance, including HVAC, lighting, safety systems, and structural inspection. Technical qualifications and experience with high-speed rail infrastructure are essential.
What type of company should bid?
Specialized railway maintenance contractors with proven experience in tunnel systems and high-speed rail operations should apply. Companies must have appropriate technical capabilities and certifications for safety-critical railway work.
Who is the buyer?
The buyer is SNCF RESEAU.
When does this tender close?
Submissions close on September 30, 2026.
L’objectif du présent dossier est le renouvellement du contrat d’entretien des différentes installations et opérations de maintenance préventive et corrective nécessaires au bon fonctionnement du tunnel de Saverne (67), tunnel de la ligne à grande vitesse Est-Européenne. Sa durée est de 8 ans (5 années fermes et 3 x 1 an optionnels). Il est conclu sans engagement minimum et avec un montant maximum qui sera indiqué dans le CPS final.
Maintenance Tunnel de Saverne 2027 - 2034
2025DOS0265001 - 2026RFI096587
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…