France – Travaux de restructuration – Port de Saint-Quay-Portrieux (22) Réaménagement du bassin et du terre-plein secteur portuaire nord Phase 2 - Travaux de démolition et de reconstruction du bâtiment SNSM - Relance du lot n°04
AI summary
This tender concerns Phase 2 restructuring works at Saint-Quay-Portrieux port in Brittany, specifically the demolition and reconstruction of the SNSM building. The lot covers dry partition and wall lining installation work, with a 13-month execution period. This is a re-launched lot following the previous procurement cancellation due to legal and technical grounds.
Established construction or building systems companies with proven experience in partition and lining work, capable of delivering over a 13-month period in a maritime environment.
Suppliers must be qualified construction contractors specializing in dry partition and wall lining systems. Experience in port infrastructure projects and compliance with French building standards are expected.
Frequently asked questions
What is this tender about?
This tender concerns Phase 2 restructuring works at Saint-Quay-Portrieux port in Brittany, specifically the demolition and reconstruction of the SNSM building. The lot covers dry partition and wall lining installation work, with a 13-month execution period. This is a re-launched lot following the previous procurement cancellation due to legal and technical grounds.
What are the requirements for suppliers?
Suppliers must be qualified construction contractors specializing in dry partition and wall lining systems. Experience in port infrastructure projects and compliance with French building standards are expected.
What type of company should bid?
Established construction or building systems companies with proven experience in partition and lining work, capable of delivering over a 13-month period in a maritime environment.
Who is the buyer?
The buyer is Sembreizh.
When does this tender close?
Submissions close on October 12, 2026.
Port de Saint-Quay-Portrieux (22) Réaménagement du bassin et du terre-plein secteur portuaire nord Phase 2 - Travaux de démolition et de reconstruction du bâtiment SNSM - Relance du lot n°04 - 13 mois Lot n°04 Cloisons sèches / Doublages. Relance du lot n°04 suite déclaration sans suite pour motifs juridiques et techniques
Port de Saint-Quay-Portrieux (22) Réaménagement du bassin et du terre-plein secteur portuaire nord Phase 2 - Travaux de démolition et de reconstruction du bâtiment SNSM - Relance du lot n°04
Port de Saint-Quay-Portrieux (22) Réaménagement du bassin et du terre-plein secteur portuaire nord Phase 2 - Travaux de démolition et de reconstruction du bâtiment SNSM - Relance du lot n°04 - 13 mois Lot n°04 Cloisons sèches / Doublages. Relance du lot n°04 suite déclaration sans suite pour motifs juridiques et techniques
- QualityValeur technique50%
- PricePrix des prestations40%
- QualityCritère environnemental10%
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…