France – Gaz naturel – ACCORD-CADRE FOURNITURE D’ÉNERGIE ÉLECTRICITÉ / GAZ NATUREL-.
Résumé IA
- Framework agreement for electricity and natural gas supply to Ardenne Metropole members - Covers active electricity, gas transport, balancing, capacity mechanisms, and associated services - Deadline: 15 June 2026 at 11:00 UTC - Buyer: Ardenne Metropole (French metropolitan agglomeration) - Estimated value not disclosed in notice
Qualified energy supplier with capabilities in electricity and natural gas distribution, network access management, balance responsibility, and capacity mechanism handling. Must serve multiple public sector sites across the Ardenne Metropole region.
Supplier must provide active electricity with continuous supply guarantee, manage network access contracts, balance responsibility, and capacity mechanisms. For natural gas: handle transport components, management costs, storage, modulation, and biogas production certificates (CPB). Services must cover all allocated member sites of the purchasing group.
Le présent accord-cadre concerne : • Fourniture de l’énergie électrique active garantie à l’alimentation en continu de la totalité des be-soins avec les Contrats d’Accès aux Réseaux souscrits par le fournisseur, la responsabilité d’équilibre, le mécanisme de capacité, les CEE et les services associés, pour les sites des membres du groupement de commande allotis. • Fourniture du gaz naturel avec les composantes d’acheminement, les CEE, l’accise gaz naturel, les certificats de production de biogaz (CPB), les coûts de gestion et de stockage, de modulation avec les services associés pour les sites des membres du groupement de commande allotis.
Lot 1 – Électricité HTA et BT > 36 kVA
Lot 2 – Électricité BT 3-36 kVA
Lot 3 – Gaz Naturel
- QualitéTechnique80%
- PrixPrix10%
- QualitéEnvironnement10%