Fournitures, études et travaux pour l'installation d'Infrastructures de Recharge pour Véhicules Électriques (IRVE) sur le parking du SDE 35
AI summary
This tender concerns the supply, design and installation of electric vehicle charging infrastructure (IRVE) on the SDE 35 car park. The project includes all materials, engineering studies and construction works required to deploy a functional charging network at the specified location.
Contractors and suppliers specialising in electric vehicle charging systems, renewable energy infrastructure, or electrical engineering should apply. Companies with proven experience in public-sector infrastructure projects are preferred.
Suppliers must demonstrate technical expertise in EV charging infrastructure design and installation. Experience with similar projects, relevant certifications, and capacity to deliver within the timeline are essential.
Frequently asked questions
What is this tender about?
This tender concerns the supply, design and installation of electric vehicle charging infrastructure (IRVE) on the SDE 35 car park. The project includes all materials, engineering studies and construction works required to deploy a functional charging network at the specified location.
What are the requirements for suppliers?
Suppliers must demonstrate technical expertise in EV charging infrastructure design and installation. Experience with similar projects, relevant certifications, and capacity to deliver within the timeline are essential.
What type of company should bid?
Contractors and suppliers specialising in electric vehicle charging systems, renewable energy infrastructure, or electrical engineering should apply. Companies with proven experience in public-sector infrastructure projects are preferred.
Who is the buyer?
The buyer is SDE 35.
When does this tender close?
Submissions close on June 4, 2026.
Description not provided
Documents not listed
Products & services not specified
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…