REMPLACEMENT PARTIEL SYSTEME DE CHAUFFAGE ET DE CLIMATISATION A LA CPAM DE MOSELLE SITE DE SARREGUEMINES
AI summary
This tender concerns the partial replacement of heating and air-conditioning systems at the CPAM (health insurance fund) facility in Sarreguemines, Moselle. The project involves upgrading existing HVAC infrastructure to improve climate control efficiency and functionality at this public health administration site.
HVAC contractors and mechanical engineering companies with expertise in heating and cooling systems should bid. Experience with institutional or public-sector facility upgrades is preferred.
Suppliers must be qualified HVAC contractors with experience in heating and air-conditioning system installation and replacement. Technical competence, relevant certifications, and proven experience with similar public-sector projects are required.
Frequently asked questions
What is this tender about?
This tender concerns the partial replacement of heating and air-conditioning systems at the CPAM (health insurance fund) facility in Sarreguemines, Moselle. The project involves upgrading existing HVAC infrastructure to improve climate control efficiency and functionality at this public health administration site.
What are the requirements for suppliers?
Suppliers must be qualified HVAC contractors with experience in heating and air-conditioning system installation and replacement. Technical competence, relevant certifications, and proven experience with similar public-sector projects are required.
What type of company should bid?
HVAC contractors and mechanical engineering companies with expertise in heating and cooling systems should bid. Experience with institutional or public-sector facility upgrades is preferred.
Who is the buyer?
The buyer is CPAM DE MOSELLE.
When does this tender close?
Submissions close on June 15, 2026.
Description not provided
Documents not listed
Products & services not specified
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…