France – Travaux relatifs aux conduites d'alimentation en eau – Feeder d'eau potable - travaux de traversée de la Sèvre à Vertou
AI summary
- Water supply feeder crossing works: DN 800 mm pipeline traversing the Sèvre river at Vertou, France. - Part of doubling project for potable water feeder between Basse-Goulaine and Vertou (Loire-Atlantique). - Buyer: Atlanticeau; Deadline: 18 June 2026, 10:00 UTC. - Lot 3 relaunch following previous procurement; civil works for water infrastructure crossing. - Estimated value not explicitly stated in notice; CPV 45232150 (water supply works).
Companies specialized in water infrastructure construction, pipeline installation, and river crossing works. Experience with large-diameter DN 800 mm potable water mains and civil engineering certifications (ISO 9001, QHSE) required. Capacity for heavy civil works and hydraulic engineering projects.
Bidders must demonstrate experience with potable water pipeline installation, river crossing techniques, and large-diameter feeder projects. Technical qualifications, safety certifications, and financial capacity to execute water infrastructure works required. Submission deadline: 18 June 2026, 10:00 UTC.
La présente consultation concerne la relance du lot n°3 " Travaux de traversée de la Sèvre a Vertou ", dans le cadre de l'opération de doublement du feeder d'eau potable DN 800 mm entre l'impasse du Rault à Basse-Goulaine et " Les Pégers " à Vertou (44).
Travaux de traversée de la Sèvre a Vertou
La présente consultation concerne la relance du lot n°3 " Travaux de traversée de la Sèvre a Vertou ", dans le cadre de l'opération de doublement du feeder d'eau potable DN 800 mm entre l'impasse du Rault à Basse-Goulaine et " Les Pégers " à Vertou (44).
Scoring criteria not specified