France – Moteurs, générateurs et transformateurs électriques – Fourniture de groupes 400 Hz mobiles sur batterie
AI summary
This tender concerns the acquisition of 10 mobile battery-powered ground power units (GPUs) at 400 Hz capacity, to be delivered in three phases. These units will supply electrical power to parked aircraft at Toulouse-Blagnac Airport.
Manufacturers or specialized distributors of aviation ground support equipment, particularly mobile power generation systems for aircraft ground operations.
Suppliers must be able to design and deliver mobile, battery-autonomous GPU equipment meeting 400 Hz aviation standards. Delivery will occur in three phases as specified in the contract.
Frequently asked questions
What is this tender about?
This tender concerns the acquisition of 10 mobile battery-powered ground power units (GPUs) at 400 Hz capacity, to be delivered in three phases. These units will supply electrical power to parked aircraft at Toulouse-Blagnac Airport.
What are the requirements for suppliers?
Suppliers must be able to design and deliver mobile, battery-autonomous GPU equipment meeting 400 Hz aviation standards. Delivery will occur in three phases as specified in the contract.
What type of company should bid?
Manufacturers or specialized distributors of aviation ground support equipment, particularly mobile power generation systems for aircraft ground operations.
Who is the buyer?
The buyer is Aéroport de Toulouse-Blagnac.
Le marché a pour objet l'acquisition, en trois phases, de 10 GPU mobiles autonomes sur batteries destinés à alimenter les avions stationnés au sol.
Documents not listed
Acquisition de 10 eGPU mobiles sur batteries (400 Hz)
Le marché a pour objet l'acquisition, en trois phases, de 10 eGPU mobiles autonomes sur batteries destinés à alimenter les avions stationnés au sol.
- CostEvaluation commerciale de la proposition50%
- QualityEvaluation technique de la proposition40%
- QualityEvaluation RSE de la proposition10%
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…