Travaux de construction de la Pharmacie à Usage Intérieur (PUI) du CHRU de Nancy
AI summary
This tender concerns the construction of an Internal-Use Pharmacy (PUI) at the CHRU Nancy hospital. The project involves multiple work packages with a total execution period of 21 months, including preparation and construction phases, with actual construction works lasting 20 months.
Construction companies with experience in healthcare facility projects, particularly hospital pharmacy infrastructure, should apply. Relevant certifications and references in medical building construction are required.
Bidders must be qualified construction contractors capable of executing hospital pharmacy infrastructure projects. Compliance with hospital standards and regulatory requirements for pharmaceutical facilities is essential.
Frequently asked questions
What is this tender about?
This tender concerns the construction of an Internal-Use Pharmacy (PUI) at the CHRU Nancy hospital. The project involves multiple work packages with a total execution period of 21 months, including preparation and construction phases, with actual construction works lasting 20 months.
What are the requirements for suppliers?
Bidders must be qualified construction contractors capable of executing hospital pharmacy infrastructure projects. Compliance with hospital standards and regulatory requirements for pharmaceutical facilities is essential.
What type of company should bid?
Construction companies with experience in healthcare facility projects, particularly hospital pharmacy infrastructure, should apply. Relevant certifications and references in medical building construction are required.
Who is the buyer?
The buyer is CHRU de Nancy.
When does this tender close?
Submissions close on April 30, 2026.
Travaux de construction de la Pharmacie à Usage Intérieur (PUI) du CHRU de Nancy : La durée d'exécution globale de l'ensemble des marchés (comprenant la période de préparation et le délai d'exécution des travaux de chacun des marchés allotis) est de 21 mois à compter de la date fixée par l'OS précisant la date de démarrage de la période de préparation (hors période de GPA). Le délai global d'exécution de l'ensemble des travaux allotis est de 20 mois.
Lot 01 : Installation de chantier / Gros oeuvre / charpente bois
Installation de chantier / Gros oeuvre / charpente bois
Lot 02 : Etanchéité / couverture
Etanchéité / couverture
Lot 03 : Menuiseries extérieures / Protections solaires
Menuiseries extérieures / Protections solaires
Lot 04 : Façades / Vêtures / FOB
Façades / Vêtures / FOB
Lot 08 : Cloisons Laboratoires
Cloisons Laboratoires
Lot 11 : CVC / Désenfumage / Plomberie - RIA / Gaz médicaux
CVC / Désenfumage / Plomberie - RIA / Gaz médicaux
Lot 12 : CFO / CFA / SSI
CFO / CFA / SSI
Lot 13 : Ascenseurs
Ascenseurs
Lot 14 : Chambres froides
Chambres froides
Lot 17 : VRD / Espaces verts
VRD / Espaces verts
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.