France – Travaux de rénovation de ponts – Autoroute A10 – Travaux de renforcement et réparation de l’ouvrage PI 5393
AI summary
This tender concerns reinforcement and repair works on bridge structure PI 5393 located on the A10 motorway in France. The project involves structural rehabilitation and maintenance of the existing bridge infrastructure to ensure safety and durability.
Construction and civil engineering companies specializing in bridge works, structural reinforcement, and motorway infrastructure maintenance should apply.
Suppliers must be qualified civil engineering and construction contractors with demonstrable experience in bridge reinforcement and repair works. Technical capacity, safety compliance, and project management capabilities are required.
Frequently asked questions
What is this tender about?
This tender concerns reinforcement and repair works on bridge structure PI 5393 located on the A10 motorway in France. The project involves structural rehabilitation and maintenance of the existing bridge infrastructure to ensure safety and durability.
What are the requirements for suppliers?
Suppliers must be qualified civil engineering and construction contractors with demonstrable experience in bridge reinforcement and repair works. Technical capacity, safety compliance, and project management capabilities are required.
What type of company should bid?
Construction and civil engineering companies specializing in bridge works, structural reinforcement, and motorway infrastructure maintenance should apply.
Who is the buyer?
The buyer is AUTOROUTES DU SUD DE LA FRANCE (ASF).
When does this tender close?
Submissions close on June 1, 2026.
La procédure concerne un marché de travaux de renforcement et de réparation de l’ouvrage PI 5393 situé sur l’autoroute A10
Autoroute A10 – Renforcement et réparation de l’ouvrage PI 5393
Les travaux à réaliser sur l’ouvrage se résument comme suit : • Renforcement du tablier existant de l’ouvrage depuis l’extrados par épaississement du hourdis en béton armé, • Mise en œuvre de l’étanchéité et des enrobés sur le tablier de l’ouvrage, • Adaptation des dispositifs de retenue.
Scoring criteria not specified
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…