France – Turbines hydrauliques – 73 BRIDES LES BAINS - Groupe turbogénérateur

DeadlineJune 15, 2026 at 08:00 AMClosed 30 days ago

AI summary

This tender concerns the supply and installation of a new Pelton turbine-generator unit at a hydroelectric facility in Brides-les-Bains, France. The project includes procurement of a Pelton turbine (820 kW nominal power), synchronous alternator, hydraulic power unit, and associated civil works adaptation, mechanical assembly, and personnel training services.

#hydroelectric#pelton turbine#generator installation#france#brides-les-bains#mechanical engineering#renewable energy
Fit for

The ideal bidder should be a specialized hydroelectric equipment manufacturer or engineering contractor with proven experience in turbogenerator installation and commissioning at hydroelectric plants.

Key requirements

Suppliers must have expertise in hydroelectric turbine systems, Pelton turbine design and installation, mechanical assembly, and hydraulic systems. Experience with generator synchronization and adaptation to existing civil infrastructure is essential.

Frequently asked questions

  • What is this tender about?

    This tender concerns the supply and installation of a new Pelton turbine-generator unit at a hydroelectric facility in Brides-les-Bains, France. The project includes procurement of a Pelton turbine (820 kW nominal power), synchronous alternator, hydraulic power unit, and associated civil works adaptation, mechanical assembly, and personnel training services.

  • What are the requirements for suppliers?

    Suppliers must have expertise in hydroelectric turbine systems, Pelton turbine design and installation, mechanical assembly, and hydraulic systems. Experience with generator synchronization and adaptation to existing civil infrastructure is essential.

  • What type of company should bid?

    The ideal bidder should be a specialized hydroelectric equipment manufacturer or engineering contractor with proven experience in turbogenerator installation and commissioning at hydroelectric plants.

  • Who is the buyer?

    The buyer is HYDROSTADIUM SA.

  • When does this tender close?

    Submissions close on June 15, 2026.

Installation d’un nouveau groupe turbogénérateur et les travaux d’adaptations associés, il s’agit notamment de : • Fourniture : o Un groupe turbine Pelton :  Chute brute : 101 m  Chute nette à Pmax: 92,6 m  Débit nominal : 1 m/3s  Puissance nominale indicative : 820 kW[MQ1.1] o Un Alternateur synchrone :  Vitesse rotation : 600 tr/min  Puissance apparente 870 kVA – 400 V o Un groupe oléo-hydraulique (HPU) • Prestations : o Etudes générales ; o Etudes d'exécutions et de dimensionnement des matériels ; o Etudes adaptation GC ; o Installations de chantier ; o Démantèlement du groupe existant ; o Montage mécanique du groupe neuf, de la centrale oléo hydraulique, des différents éléments de vantellerie et de tuyauterie ; o Scellement du groupe neuf dans le génie civil existant ; o Formation du personnel EDF ; Hors prestation Titulaire : • Les travaux de démolition du génie civil existant • Les travaux d’ordre électrique et contrôle commande liés à la mise en service du groupe Cette liste est non exhaustive. Le périmètre total sera décrit dans un cahier des charges qui sera joint au dossier de consultation.

Buyer
HYDROSTADIUM SA
Buyer ID: 438 289 662·Mme Alix MARTIN
22 avenue des Vieux Moulins, 74000, ANNECY
Body responsible for review procedures
Tribunal Judiciaire d'Annecy
Buyer ID: 17730111600238
51 rue Sommeiller, BP 232, 74011, ANNECY
Other organization
Publications Office of the European Union
Buyer ID: PUBL
2417, Luxembourg

Computing match…

AI document analysis

We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.

Loading…