France – Turbines hydrauliques – 73 BRIDES LES BAINS - Groupe turbogénérateur

DeadlineJune 23, 2026 at 08:00 AMClosed 22 days ago

AI summary

This tender concerns the supply and installation of a new Pelton turbine generator set at Brides-les-Bains, France. The project includes delivery of a 820 kW turbine, synchronous alternator, and hydraulic power unit, along with comprehensive services including design studies, mechanical assembly, civil works integration, and personnel training.

#hydroelectric#pelton turbine#france#brides-les-bains#generator set#hydraulic systems#installation services
Fit for

Companies specializing in hydroelectric equipment supply and installation, including turbine manufacturers, mechanical engineering contractors, and firms with demonstrated expertise in generator set integration and commissioning services.

Key requirements

Suppliers must be capable of delivering and installing hydroelectric turbine systems, conducting detailed engineering studies, performing mechanical assembly and integration into existing civil structures, and providing operator training. Experience with Pelton turbines and hydraulic systems is essential.

Frequently asked questions

  • What is this tender about?

    This tender concerns the supply and installation of a new Pelton turbine generator set at Brides-les-Bains, France. The project includes delivery of a 820 kW turbine, synchronous alternator, and hydraulic power unit, along with comprehensive services including design studies, mechanical assembly, civil works integration, and personnel training.

  • What are the requirements for suppliers?

    Suppliers must be capable of delivering and installing hydroelectric turbine systems, conducting detailed engineering studies, performing mechanical assembly and integration into existing civil structures, and providing operator training. Experience with Pelton turbines and hydraulic systems is essential.

  • What type of company should bid?

    Companies specializing in hydroelectric equipment supply and installation, including turbine manufacturers, mechanical engineering contractors, and firms with demonstrated expertise in generator set integration and commissioning services.

  • Who is the buyer?

    The buyer is HYDROSTADIUM SA.

  • When does this tender close?

    Submissions close on June 23, 2026.

Installation d’un nouveau groupe turbogénérateur et les travaux d’adaptations associés, il s’agit notamment de : • Fourniture : o Un groupe turbine Pelton :  Chute brute : 101 m  Chute nette à Pmax: 92,6 m  Débit nominal : 1 m/3s  Puissance nominale indicative : 820 kW[MQ1.1] o Un Alternateur synchrone :  Vitesse rotation : 600 tr/min  Puissance apparente 870 kVA – 400 V o Un groupe oléo-hydraulique (HPU) • Prestations : o Etudes générales ; o Etudes d'exécutions et de dimensionnement des matériels ; o Etudes adaptation GC ; o Installations de chantier ; o Démantèlement du groupe existant ; o Montage mécanique du groupe neuf, de la centrale oléo hydraulique, des différents éléments de vantellerie et de tuyauterie ; o Scellement du groupe neuf dans le génie civil existant ; o Formation du personnel EDF ; Hors prestation Titulaire : • Les travaux de démolition du génie civil existant • Les travaux d’ordre électrique et contrôle commande liés à la mise en service du groupe Cette liste est non exhaustive. Le périmètre total sera décrit dans un cahier des charges qui sera joint au dossier de consultation.

Buyer
HYDROSTADIUM SA
Buyer ID: 438 289 662·Mme Alix MARTIN
22 avenue des Vieux Moulins, 74000, ANNECY
Body responsible for review procedures
Tribunal Judiciaire d'Annecy
Buyer ID: 17730111600238
51 rue Sommeiller, BP 232, 74011, ANNECY
Other organization
Publications Office of the European Union