France – Études de faisabilité, service de conseil, analyse – Etude d'opportunité et de faisabilité de l'extension de la Ligne 1 du métro lillois
AI summary
This tender concerns a feasibility and opportunity study for extending Line 1 of the Lille metro system. The European Metropolis of Lille seeks consulting services to evaluate the technical, economic, and operational viability of this infrastructure expansion project.
Consulting firms specializing in transport infrastructure, urban planning, or engineering services should apply. Experience with public transit systems and metro extensions is highly valued.
Suppliers must have expertise in urban transit planning, feasibility studies, and metro system analysis. Relevant experience with similar infrastructure projects and proven analytical capabilities are essential.
Frequently asked questions
What is this tender about?
This tender concerns a feasibility and opportunity study for extending Line 1 of the Lille metro system. The European Metropolis of Lille seeks consulting services to evaluate the technical, economic, and operational viability of this infrastructure expansion project.
What are the requirements for suppliers?
Suppliers must have expertise in urban transit planning, feasibility studies, and metro system analysis. Relevant experience with similar infrastructure projects and proven analytical capabilities are essential.
What type of company should bid?
Consulting firms specializing in transport infrastructure, urban planning, or engineering services should apply. Experience with public transit systems and metro extensions is highly valued.
Who is the buyer?
The buyer is Métropole européenne de Lille.
When does this tender close?
Submissions close on July 30, 2026.
Etude d'opportunité et de faisabilité de l'extension de la Ligne 1 du métro lillois
Etude d'opportunité et de faisabilité de l'extension de la Ligne 1 du métro lillois
- PricePrix40%
- QualityValeur technique58%
- QualityValeur environnementale2%
Computing match…
AI document analysis
We read the tender PDFs and DOCX files and surface key requirements, deadlines, budget and red flags.
Loading…